Hall D Maintenance Status Long Description

Click the Last Maintenance date to update when the last maintenance was performed

Click the Task to EDIT the long description of this task

Click here to add a new item to the Hall D maintenance maintainer

TASK Primary Contact Secondary Contact PERIOD (days) NEXT MAINTENANCE LAST MAINTENANCE
Upstream pump #2 Sol rmont@jlab.org brandsh@jlab.org 360 10/18/25 10/23/24

Turbopump#2 F223960 HiPace 300 Serial # 15480088 Change/inspect oil cartridge 4 years Backing Pump Penta 35 serial # 21746017 Change oil annually (if dirty), wipe down exterior of pumps. Oil is P3. Oil changed on the Backing Pump 11/29/16. Operating Fluid Reservoir changed 11/29/16. 27,394hrs on Turbopump Operating Fluid Reservoir # PM 133 302 AU 2/7/2019 Inspected oil ok. Will service at end of run.ASAP 8/26/2019 Change oil in backing pump. P3 oil was used. 10/22/2020 Changed fluid reservoir cartridge on turbo and change oil in backing pump.32,768 hrs 1/28/2022 Ghanged fluid reservoir cartride on turbo and changed oil in backing pump. 5/12/22 Turbo serial#15515650 F228060 replaced. Backing pump checked. 7-12-2023, Backing pump oil Changed, 42988 Hours on Display. 10-23-24 This is on Pump cart #4 sol.#2. Backing pump oil changed.