Hall D Maintenance Status Long Description

Click the Last Maintenance date to update when the last maintenance was performed

Click the Task to EDIT the long description of this task

Click here to add a new item to the Hall D maintenance maintainer

TASK Primary Contact Secondary Contact PERIOD (days) NEXT MAINTENANCE LAST MAINTENANCE
Pump #5 Collimator C keithb@jlab.org bunton@jlab.org 365 10/18/25 10/18/24

Turbopump #5 F223673 HiPace 80 Serial#15635716 Change/inspect oil cartridge 4 years Backing Pump Penta 20 serial # 21838873 Change oil annually (if dirty)Oil is P3, wipe down exterior of pumps. Dismount pump from Polarimeter and blank off with gauging. Run up pump and record ultimate pressure after 1 hour. Remount pump onto Polarimeter and leak check. Changed oil in Backing Pump 1/11/2016 2240 hrs on Turbopump 2/7/2019 oil is ok Changed oil in rotary vein pump 8/4/2021 7-12-2022 Changed oil in Backing Pump 10-18-2024 Changed oil in backing pump