Heat Ex-Changers bunton@jlab.org dallen@jlab.org 1825 02/28/27 03/01/22

1-Remove The Heat Ex-Changers That the supply the FDC Chiller, and the Target Compressor. 2-Blow all water from Ex-Changers 3-Once dry,have Ex-Changers cleared from RADCON. 4-Have Accelerator Installation Acid Flush the Heat Ex-Changers. 5- When re-assembling the FDC Heat Ex-Changer, replace both...Precision Flow-Adjustment Valves. Brass Body with Locking Knob Handle, 1/2 NPTF Female McMaster Carr part 4995K17 6- Replace all filters associated with the Heat Ex-Changers,(canister filters)