Click the Last Maintenance date to update when the last maintenance was performed
Click the Task to EDIT the long description of this task
Click here to add a new item to the Hall D maintenance maintainer
TASK | Primary Contact | Secondary Contact | PERIOD (days) | NEXT MAINTENANCE | LAST MAINTENANCE |
He Valve Membrane CK | rmont@jlab.org | brandsh@jlab.org | 180 | 11/19/24 | 05/23/24 |
1. Review the helium pressure in the Solenoids Distribution Box for the previous 30days looking for excursions higher than 1.6atms. 2. Inspect the plastic bag covers on the large Helium relief valves for damage. 3. If the pressure had reached higher than 1.6atms or the bag covers have damage inspect the membranes and make a log entry in the HDLog. |