Click the Last Maintenance date to update when the last maintenance was performed
Click the Task to EDIT the long description of this task
Click here to add a new item to the Hall D maintenance maintainer
TASK | Primary Contact | Secondary Contact | PERIOD (days) | NEXT MAINTENANCE | LAST MAINTENANCE |
Flood Gates Maint. | rmont@jlab.org | brandsh@jlab.org | 365 | 08/15/25 | 08/15/24 |
Flood Gates 1-Move Smaller Gates to Lay-down Area (gravel area, does not block emergency egress) and arrange on dunnage. 2-Wash, inspect, and wipe air bladders. 3-Remove, clean, and inspect all bolts and washers on retaining latches. Replace damaged hardware, anti seize bolts and reassemble, (latches to Flood Gates). 4-Clean, flush, and inspect schrader valve and cores. Replace suspect cores and install new dust caps. Replace bad gauges. Flood Gate Grates 1-Blow/Flush debris out of Holes in bottom of Floor Grates. Inspect, clean and wipe sealing surfaces where air bladders seal. |