FCAL 2 Chiller Swap dallen@Jlab.org rmont@jlab.org 360 09/04/25 09/09/24

Swap Chiller with Spare Chiller 1 and 2 in service currently Chiller 3 is Standby When Removing chiller from service: Unplug Move to Drain Area Drain the chiller While Draining, remove 4 side panels Open the reservoir lid Clean and wipe out excess water Check for build up and clean thoroughly Leave uncovered for a few days to let excess moisture evaporate Replace Panels and Store for next years swap