TASK | Primary Contact | Secondary Contact | PERIOD (days) | NEXT MAINTENANCE | LAST MAINTENANCE |
FCAL 2 Chiller Swap | dallen@Jlab.org | rmont@jlab.org | 360 | 09/04/25 | 09/09/24 |
Swap Chiller with Spare Chiller 1 and 2 in service currently Chiller 3 is Standby When Removing chiller from service: Unplug Move to Drain Area Drain the chiller While Draining, remove 4 side panels Open the reservoir lid Clean and wipe out excess water Check for build up and clean thoroughly Leave uncovered for a few days to let excess moisture evaporate Replace Panels and Store for next years swap |