TASK | Primary Contact | Secondary Contact | PERIOD (days) | NEXT MAINTENANCE | LAST MAINTENANCE |
Air System Relief | keithb@jlab.org | whitey@jlab.org | 1095 | 08/28/26 | 08/29/23 |
Need to have the Vessel inspector coordinator verify condition of air system relief valve (@ regulator). This is part of pressure system PS-PHY-13-011. New PS-12 test & inspection form required. To be uploaded to pressure system documentation -docushare. 8/29/2023 95 PSI Relief valve replaced and leak tested and FORM PS-5 was updated. |