** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 
** - Testing procedure [https://halldweb.jlab.org/detectors/fcal2/dividers/divider_test_guide.pptx]
 
** - All dividers have been fabricated and tested by George [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers]
 
** - All dividers have been fabricated and tested by George [https://halldweb.jlab.org/wiki/index.php/Final_test_of_dividers]
***  Continue removing regulators from the PCB
+
***  Continue removing regulators from the PCB (about 70 regulators have been removed, require re-test divider)
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
* '''Installation of the FCAL2 detector & integration to GlueX''' -- Sasha / Vlad / Hakob / Laveen  
 
** <span style="color: red"> Installation of the LMS has been completed </span>  [https://logbooks.jlab.org/entry/4282307]
 
** <span style="color: red"> Installation of the LMS has been completed </span>  [https://logbooks.jlab.org/entry/4282307]

Revision as of 08:29, 10 May 2024

Meeting time and location:

Agenda

  • Preparation of parts for ECAL -- Sasha
    • - signal cables and 2 patch panels [1] - done
    • - HV short cables: done
    • - HV long cable, 18 ready (out of 36)
    • - HV distribution boards: not designed
    • - LV cables: waiting for about 20 cables
    • - LV distribution boards [2]. One board out of 4 is ready
    • - LED: the prototype of the LED board has been received. Chris will populate it with components
  • Ongoing projects
  • Testing of PMT dividers -- Sasha / Vlad / George / Mindy
    • - Testing procedure [3]
    • - All dividers have been fabricated and tested by George [4]
      • Continue removing regulators from the PCB (about 70 regulators have been removed, require re-test divider)
  • Installation of the FCAL2 detector & integration to GlueX -- Sasha / Vlad / Hakob / Laveen
    • Installation of the LMS has been completed [5]
    • Installation and testing cables and dividers [6][7]
    • All crates are connected to the network switch Ethernet switch [8]
    • Preparing for testing installed dividers
    • Detector installation page
    • Preparation for beam tests with the PS
      • measure shower beam profile
      • shower reconstruction between PbWO4 and LG
    • Other hardware projects
      • --prototype of the ECAL veto counter
      • --study shower profile using PS (also transition region between lead tungstate and LG modules (?) )
  • FCAL2 poster for open house?
    • JEF/ECAL/FCAL poster
  • Analysis/Simulation